亚洲中文字日产幕 国产精品噜噜 精品人妻一区二区三区视频下架 狠狠色极品盛宴

Perform the following steps when handling transformer oil

Release time:2019-08-09 14:45

author:健陽達(dá)電子

source:

Perform the following steps when handling transformer oil


1. Pressure filtration method: The insulating oil used for power transformers must have insulation properties and thermal conductivity properties (national standards). At the installation site, the general pressure filtration method is used to complete the general drying (removal of moisture) and purification (removal of dirt) of the insulating oil. Methods.


2. Open valves 8 and 11, then start the oil pump and open valves 6 and 7.

(1) When stopping oil, first turn off 6 and 7, then stop the oil pump, then close the valves of 8 and 11.

(2) During normal operation, the pressure gauge is working normally under the pressure of 3*10 ~4*10 Pa. If the impurities and oil paper are clogged, the pressure will increase. When the pressure reaches 6*10 Pa, it must be stopped and the filter paper should be replaced.

(3) The filter paper is dried in an oven at 80-90 ° C for 24 hours before use, and placed in a clean container.

(4) The filter screen is cleaned every 10~15 hours. At the beginning, within 3-5 minutes of oil filtering, the oil outlet hole is sent back to the sewage tank through the valve 10 to re-filter, and the oil in the oil filter is accumulated and passed through the valve. 9 Return to the sewage system and filter again. The above filter oil should be subjected to multiple times of essence and drying.

13.jpg

3, transformer charged oil filter:

(1) When the voltage is higher than 10V, it is not advisable to use charged oil. Because more bubbles are generated during filtration, the bubbles will be free under the action of higher voltage, which will deteriorate the insulation performance of the oil and cause internal discharge. When charging the oil, the gas released from the oil in the gas relay is periodically discharged.

(2) When the oil is filtered, the oil pipe and the oil filter should be grounded reliably to protect the personal safety of the staff. The staff should be professional, have to be supervised, and wear good insulation products.

(3) Operation: At the interface of the 4 and 5 diagonal valves, the pressure type oil filter is connected, the valve 4 draws out the oil, and the oil tank is returned from the valve 5, and filtered through a plurality of cycles until the standard is met.


  • 上一篇:沒有了
  • 下一篇:沒有了
classification: Companynews

Since it's here, leave something

To serve you better

Waiting for your call: 86-769-89308858!

安全驗(yàn)證-水平拖動(dòng)滑塊完成拼圖

永丰县| 常德市| 邵武市| 姚安县| 朔州市| 乌兰浩特市| 玛沁县| 凌源市| 临泉县| 彰武县| 呼图壁县| 翼城县| 弥勒县| 合山市| 南昌县| 乌海市| 皋兰县| 砀山县| 旬阳县| 舞钢市| 栖霞市| 依安县| 科尔| 兴仁县| 桓台县| 托克托县| 克山县| 丹巴县| 林西县| 内江市| 额尔古纳市| 正宁县| 晋江市| 泾阳县| 漳州市| 富源县| 静乐县| 米易县| 唐山市| 泰顺县| 西林县|